Should I get the site work
done first?
No, it isn’t a smart idea for a few reasons.
First of all, although you think you know the exact layout of the project there
are many influencing factors. Not only do you have to know where the building
site is, but you also have to consider the driveway location, the septic
location, the well location, property line setbacks and so on. There are
required distances from the well to the septic. There is trench separation
needed between electric and sewer and water. Any preparation you do may be in
the wrong place, and hence a waste of money. You wouldn't want to prepare a
driveway bed just to dig a trench through it later.
Also, if you haven’t chosen your builder yet
there is another concern. As a builder, we like to work with certain
subcontractors. Since we are often given sole liability for the project, the
only way we can guarantee our work is if we know what went into it, and we don’t
all get along. The last thing you need is a personality conflict on the job.