Can I make changes as we go
along?
We strongly discourage them, and we penalize
them with preset change order fees. This may seem a little strict, but from a
construction point of view a change typically costs a lot of labor and
materials. The entire reason you had a blue print drawn up was to have a
picture of what you want. The contract is based on the blue prints as well as a
list of material specs to be used. You agree to the contract before you sign
it.
Under special circumstances when we are
notified far in advance we may waive the change order fee, but typically we are
not informed in time. For example, we order windows well before they are needed
and we install them after a window is framed. If you see the window size and
you ask to have it changed after the fact, not only do we have to modify the
framing but we have to return a window and get a replacement. That means we
have labor costs, material costs, a restocking fee and a ruined schedule. Maybe
even lost work. Many changes may not even be possible from a structural
standpoint.
So please exercise
foresight when decide on a project.